ca4b7c9ff4
Give each of Naggy/Nice/StrictMock a base class whose constructor runs before the mocked class's constructor, and a destructor that runs after the mocked class's destructor, so that any mock methods run in either the constructor or destructor use the same strictness as other calls. PiperOrigin-RevId: 348511612 |
||
---|---|---|
.. | ||
cheat_sheet.md | ||
community_created_documentation.md | ||
cook_book.md | ||
for_dummies.md | ||
gmock_faq.md | ||
pump_manual.md |